The Calistoga Setback Levee project was slated to take up to 2 years, but Washington Rock Quarries was able to produce and deliver 398,000 tons of material in 4.5 months. Less than a month after the completion of the job, Western Washington had a week of record rainfall. The river crested the banks of the old levee, which would have flooded the town of Orting. Luckily, the quickly completed levee prevented this from happening.
Learn more about the rock products supplied to this project on our website: [ Ссылка ].
Videography and Video Editing by Joel Carver of CSI Drone Solutions.
Levee Build at the Calistoga Setback Levee
Теги
floodingflood controlWashington RockquarryWashington Rock QuarriesOrtingcrushed rockflood preventionSeattleTacomalevee construction methodsCalistoga Setback Leveeleveeorting waorting riverlevee engineeringlevee floodlevee of a riverlevee riverlevee repairlevee systemlevee waterflood control methodsflood control structuresflood control systemsflood control case studyriver flood control