The Kariba Dam Plunge Pool Reshaping project aims at reshaping its 90m deep plunge pool scoured into fresh gneiss. The plunge pool was formed by flood discharges from this 130m high dam. The objective of the project is to improve energy dissipation during flood releases. In this video the Plunge Pool has been dewatered to elevation 360masl; with another 50m to go.
![](https://i.ytimg.com/vi/4R2Nwpz27v8/maxresdefault.jpg)