POKHARA INTERNATIONAL AIRPORT VIDEO TOUR || Pokhara International Airport Latest Update/ Test Flight
#PIA #Pokhara #nepaldarpanupdate
Content Keywords:
Pokhara International Airport Video Tour,
Pokhara international Airport latest Update,
Pokhara International Airport Test Flight,
Pokhara International Airport New Update,.
Pokhara International Airport Construction Update,
Pokhara International Airport Update Today....
Pokhara International Airport Construction Latest Update
Location - Chinnedanda, Pokhara, Gandaki Pradesh, Nepal
Government Agency - Civil Aviation Authority of Nepal
Construction Company - China CAMC Engineering
Contract Model - EPS
Budget - USD 215.96 Million
Runway length - 2500 m
Runway width - 45 m
Runway Orientation - East west
Taxiway length - 1200 meters
Taxiway width - 23 meters
The calibration flight is starting at the Pokhara Regional International Airport from today (Monday) to test the capability of the connecting devices.
For this purpose, Aero Thai's ship reached Pokhara on Saturday itself.
The Civil Aviation Authority of Nepal (CAAN) has approved the schedule for mechanical test flight of Pokhara Regional International Airport from November 21 to November 27.
The aircraft that arrived for the calibration flight will test all the equipment connected to the Pokhara Regional International Airport. The communication equipment is still being tested. In particular, the Instrument Landing System (ILS) will be tested during the calibration flight. This technology is useful during take-offs and landings.
During the period of calibration flight, regular flights will be operated before 10 am and from 1pm to 2:30 pm. Most of the flights will take place from half past five till late in the evening after the calibration flights are over.
Follow Us On Facebook : [ Ссылка ]
Stay Tuned With our Latest Updates :
[ Ссылка ]
![](https://i.ytimg.com/vi/6tyJ4byL03U/maxresdefault.jpg)