Well, it's done! Well... most of the garden is done!
For this summer, the garden renovation is complete. The only thing left to do is to do something with the BBQ station, but that's something for next year now.
Check out all the parts of the renovation below:
Part 1 - Planning:
[ Ссылка ]
Part 2 - Digging a Sleeper Wall Trench:
[ Ссылка ]
Part 3 - Building a Retaining Wall with Sleepers:
[ Ссылка ]
Part 4 - Building Steps from Timber Sleepers:
[ Ссылка ]
Part 5 - Ground Prep for a Patio Sub-Base:
[ Ссылка ]
Part 6 - Preparing the Patio Sub-Base:
[ Ссылка ]
Part 7 - Laying a Porcelain Patio:
[ Ссылка ]
Part 8 - Installing a French Drain
[ Ссылка ]
Part 9 - Levelling Clay Soil
[ Ссылка ]
Part 10 - Levelling a New Lawn with Topsoil
[ Ссылка ]
Part 11 - Seeding a New Lawn
[ Ссылка ]
Part 12 - One Month Lawn Update
[ Ссылка ]
Part 13 - First Cut of a Newly Seeded Lawn
[ Ссылка ]
Part 14 - Installing a Flower Bed
[ Ссылка ]
Part 15 - Bordering in Front of the Retaining Sleeper Wall
[ Ссылка ]
Part 16: Lawn Bordering on the Top Tier
[ Ссылка ]
Part 17: Seeding the Top Tier Lawn
[ Ссылка ]
Part 18: Patio Bordering
[ Ссылка ]
Part 19: Planting Box Hedges
[ Ссылка ]
Complete Garden Renovation - UK New Build Garden
Теги
garden renovationrenovationnew build gardensloped lawnsloped gardentiered gardenretaining wallhow tosleepersretaining sleeper wallsleeper wallpatioporcelain patiobox hedgeshow to renovate gardenlawn renovationnew lawnseeding a new lawngrass seedgarden furnitureflower bednew build renovationgarden ideasgarden inspirationlawn ideasperfect lawnrenovaterenovate gardennew buildclay soilcomplete renovation