This is the sixth video in a series of seven, which covers the build of the Prusa MK3S+ printer from unboxing up to the first test print.
This video covers chapter 6,7 and 8 of the assembly instructions, or the Electronics assembly.
00:00 Step 6.2 Preparing the LCD parts
00:32 Step 6.3 Checking the LCD cables
01:13 Step 6.4 Assembling the LCD supports
01:32 Step 6.5 Assembling the LCD-cover
01:55 Step 6.6 Securing the LCD controller
02:08 Step 6.7 Preparing the supports for assembly
03:08 Step 6.8 Mounting the LCD display onto the printer
03:24 Step 6.9 Assembling the LCD knob
03:40 Step 6.10 Haribo time!
03:44 Step 7.3 Heatbed cable assembly (part 2)
04:12 Step 7.4 Heatbed cable assembly (part 3)
04:27 Step 7.6 Preparing the heatbed-cable cover
05:08 Step 7.7 Mounting the heatbed-cable-cover
05:18 Step 7.8 Mounting the heatbaed-cable-cover
06:07 Step 7.10 Wrapping the heatbed cables
07:29 Step 7.11 Securing the sleeve in place
08:08 Step 7.14 Mounting the heatbed (part 1)
08:42 Step 7.15 Mounting the heatbed (part 3)
09:47 Step 7.17 Mounting the headbed (part 4)
10:08 Step 7.18 Preparing the PSU parts
10:17 Step 7.19 Assembling the PSU
10:31 Step 7.20 Assembling the PSU
11:03 Step 7.22 Connecting the power cables
11:46 Step 7.24 Power panic and PSU cover
11:59 Step 7.35 Haribo time!
12:03 Step 8.3 Preparing the Einsy-door
12:22 Step 8.6 Einsy-door assembly
13:50 Step 8.7 Wrapping X-axis cable
14:44 Step 8.8 Preparing the Einsy-base
15:30 Step 8.9 Preparing the Einsy-base (part 2)
18:10 Step 8.10 Preparing the Einsy-base (part 3)
19:22 Step 8.11 Mounting the Einsy-base (part 1)
20:14 Step 8.12 Mounting the Einsy-base (part 3)
20:53 Step 8.14 Cable management (part 1)
22:08 Step 8.15 Cable management (part 2)
23:37 Step 8.16 Cable management (part 3)
25:07 Step 8.17 Cable management (part 4)
26:25 Step 8.18 Cable management (part 5)
27:33 Step 8.19 Cable management (part 6)
30:05 Step 8.22 Connecting the heatbed cable bundle
31:28 Step 8.25 PSU and HB power cables
32:14 Step 8.27 PSU and HB - final check
32:42 Step 8.28 Cable management
33:20 Step 8.29 Connecting the extruder cable bundle
33:25 Step 8.30 Wrapping the cable bundle
33:31 Step 8.31 Connecting the extruder cable bundle
34:47 Step 8.33 Connecting the motor cables
36:19 Step 8.34 Preparing the zip ties
36:50 Step 8.35 Hotend cable management (part 1)
38:43 Step 8.36 Hotend cable guiding (part 2)
42:31 Step 8.38 Finalizing the Einsy-case
43:00 Step 8.39 Mounting antivibration feet
43:45 Step 8.40 Assembling the double spool holder
44:23 Step 8.42 Mounting the double spool holder
44:39 Step 9.1 SuperPINDA adjustment (part 1)
44:57 Step 9.2 SuperPINDA adjustment (part 2)
47:23 Step 9.3 SuperPINDA adjustment (part 3)
Ещё видео!