A new booster transport stand was tested, a Liebherr crane was delivered, and a crew worked on a booster forward dome.
Video and Pictures from Mary (@BocaChicaGal), Nic (@NicAnsuini), and the NSF Robots. Edited by Jack (@theJackBeyer).
All content copyright to NSF. Not to be used elsewhere without explicit permission from NSF.
Click "Join" for access to early fast turnaround clips, exclusive discord access with the NSF team, etc - to support the channel.
Rolling Updates and Discussion: [ Ссылка ]
Articles: [ Ссылка ]
NSF Store: [ Ссылка ]
L2 Boca Chica (more clips and photos) from BC's very early days to today.
[ Ссылка ]
(Join L2 and support NSF here: [ Ссылка ])
0:00 - Chopsticks Testing
0:44 - Booster 8 Common Dome Section in the Scrapyard
1:11 - LOX Truck Waiting at the Production Site
1:32 - New Liebherr LTM Crane Delivered
2:31 - Wide Bay Construction
3:05 - Wide Bay Elevator Installation
3:28 - Wide Bay Stair Construction
4:04 - Booster 7 in the High Bay
4:33 - Dome Sleeving Stand Modifications Continue
5:03 - Old Booster Header Tank
5:35 - Domes at the Production Site
5:56 - Crew Working on a Booster Forward Dome
6:33 - New Booster Transport Stand Testing
8:01 - The Orbital Launch Site
8:20 - The Orbital Launch Mount and Chopsticks
8:35 - The Orbital Launch Mount
8:51 - The Top of Booster 4 and Part of the Quick Disconnect Arm
9:14 - Booster 4 and Ship 20
9:42 - A Crew Works on the Launch Tower Rails
9:57 - The Booster Quick Disconnect and Orbital Launch Mount
10:09 - Ship 20 and Launch Tower Work
10:19 - Road Work on Highway 4
10:52 - Ship Common Dome Section
11:17 - New Nosecone
![](https://i.ytimg.com/vi/AUD_J3zVvY0/maxresdefault.jpg)