An important part of bored pile construction is the cleaning and inspection of the bottom of the hole prior to the placement of reinforcement and concrete. To achieve cleaning once drilling is complete, a cleanout bucket is typically used to remove any material unsuitable for end bearing support. Bottom inspection is then performed, often by lowering a camera down the bore hole, a procedure that gives a rough idea of the thickness of any debris left at the bottom. To improve the inspection method, SQUID™ takes accurate displacement and penetrometer measurements, providing an objective, quantitative assessment.
Learn more about SQUID at www.pile.com/products/squid
Pile Dynamics, Inc.
info@pile.com
Ещё видео!