We then attended to a reported leaking concrete pool in Shailer Park, we tested the pump filtration system under load before dye testing the skimmer box and 3 x return jets. We noted 2 x structural cracks going down the wall of the pool. We hydrophoned the main drain including hydrostatic valve, skimmer box, return jets and structural cracks. We entered the pool and dye tested down both cracks but found one leaking over a distance of 1.20 metres. We applied a epoxy putty to the site before re dye testing to find it secure. This is a temporary fix for the client to get them through over the summer period.