The new warehouse in Gdansk is the biggest European warehouse with engine cooling and air conditioning stock. It contains a total volume of 30.000 m2 and is 12 meters high. It has 33.000 bulk locations and 12.000 pick locations. The location was newly built, so the entire warehouse configuration was built from scratch. Also for small parts, like thermostats and sensors, there are dedicated picking locations. The new location also includes a brand-new office, testing facilities and their own workshop.
Ещё видео!