My choice for splitting is to cut trunks/bows in 12 ft lengths. Ring it 60% of the way through. Lift it onto the trailer with the loader, cut side down. Complete the rest of the cut on the trailer. Same with each piece, then roll the rings off the trailer onto the splitter. Off the splitter straight into the shed. No heavy lifting if all works out to plan.
![](https://i.ytimg.com/vi/EL1uQOYOxF4/maxresdefault.jpg)