PROJET DJAMAA EL DJAZAIR - Engr. Suleyman YAGCIZEYBEK (MIET) was the first (former) Project Manager for GMA Project MEP/Electrical Works (for Engineering Design, Project Management, Procurement Management and Construction Supervision of MEP Works) for the third biggest Advanced Architectural Mosque Building complex in the World sit on/laid out 20 hectares (49 acres, which is around 400.000 m2) area having twelve separate buildings including advanced architectural pray halls, minaret building soaring 270 meters into the sky with two panoramic elevators, cultural center, exhibition center, library, museum, education campus building and dormitory buildings, car parks, Administration Buildings of ANARGEMA and auxiliary facilities buildings and HV Substation Building including 10kV Medium Voltage System Transformers and MV Generators (RN&RS Loops around the whole complex).
Client(Owner): ANARGEMA "Agence Nationale de Realisation et de Gestion de Djamaa El Djazair"
Design Institute: KUK "Krist, Ulrich and Kössl"- Germany
Main EPC Contractor: CSCEC "China State Construction Engineering Corporation".
MEP Contractor: IMTECH-AE "Royal Imtech N.V (IMTECH Deutschland Gmbh) & Co. KG and AE "Arma Elektropanç A.Ş."
![](https://s2.save4k.ru/pic/FmDgPphPmZo/mqdefault.jpg)