This video about First stage - Pilot well drilling during the construction works of water pipe using Horizontal directional drilling method.
The water pipe is about 100 meters (328 feets) long, laid at a depth of 4 meters (13 feets).
Horizontal directional drilling (HDD) is a safe method of installing an underground pipeline.
The Second stage of HDD will be in the next video.
If you like this video please like and subscribe.
#arendadrom #hdd #horizontaldirectionaldrilling #constructionwaterpipe #nodig #drillingwaterpipe #pilotwelldrilling #гнб #проколподдорогой #undergroundpipeline
www.arendadrom.com
[ Ссылка ]...
[ Ссылка ]
Music:
Josh Pan - Cat Shat in the box
Bobby Richards - Tak
![](https://i.ytimg.com/vi/MjQLKYN7BOM/maxresdefault.jpg)