Berthing Stbdside using port anchor n 1 tug n
mooring boat.
Shifting from Fukuyama Anchorage to Berth
about One hour shifting. Harbor speed 8 to 7 kts
when abt 1 mile from berth gradually reduced speed to 3 kts.
Approach to berth, parallel vessel to the berth with a clearance distance from berth about
5 cables.
Once November Flag abeam on your bridge wing Let go port achor n engine on slow astern
to stop headway.
After dropping anchor send forward spring to mooring boat for first line ashore.
When fwd spring line secured to berth pick up slack n Ask After Tug to positio Nine Oclock n start pushing the vesel towards berth.
Control the bow approach to the berth by adjusting windlass brake. After Tug ask her to push or pull to control Astern approach to the berth. Once the vessel parallel to the berth n about 40 meters. Use only Fore n Aft mooring lines to alongside the vessel slowly n safety.
Pls subscribe to watch more berthing/unberthing maneuver. Thank You.
00:00 intro
00:05 Passing Inner Harbor
01:00 Pick up After Tug Line
01:25 Tug Line secured aft
02:05 Approaching Berth
02:45 Vessel parallel to the berth
03:25 Send fwd spring line to mooring boat
04:18 Let go port anchor
04:42 Fwd Sptong Line secured to the berth
04:45 Pick up the slack on fwd spring line.
06:00 Send headlibe to mooring boat.
06:46 Send Aftet Spribg Line to Mooring boat
07:30 After Spring Line secured to the berth
07:35 Pick up slack on After Spring Line.
08:35 Vessel coming alongside slowly n
easy.
10:25 Vessel in position.