The first air ducts are installed (2:50) on the roof of Tesla's Gigafactory Berlin-Brandenburg.
Top soil is placed around the first infiltration basin (0:55) and the first trailers docking to the loading docks (2:15).
The first columns are placed for the waste water treatment building (7:45) and the floor is getting build at the central utility building (12:00).
A new area has been paved with asphalt (15:00). It's probably another temporary parking area.
If you want to support me:
[ Ссылка ]
[ Ссылка ]
Bitcoin: bc1qdl63dswrepe25hdh86wlktmrhcm29t3zyqa8k2
Follow me on Twitter for the latest updates:
[ Ссылка ]
See all my photos from Giga Berlin:
[ Ссылка ]
For videos from Giga Shanghai I recommend the channel of Wuwa (乌瓦):
[ Ссылка ]
Music in this Video:
1. Jeremy Blake - The Emperor's Army
2. Jeremy Blake - Let's Go Home
3. Broken Elegance - Echo
4. Broken Elegance - Restless
5. Broken Elegance - Unconditionally
6. Broken Elegance - Reflection
[ Ссылка ]
Creative Commons Attribution 3.0 Unported (CC BY 3.0)
[ Ссылка ]
I have the permission to fly over the factory site as well as the industrial rail.
#tesla #gigafactory #gigaberlin
Ещё видео!