Interstate 4 eastbound through the Orlando Area to its eastern terminus at I-95 just outside of Daytona Beach. Includes the recently opened Express Lanes in Orlando.
Filmed: March 2022
Cities Explored: [ Ссылка ]
Follow on Instagram: [ Ссылка ]
Make a one time donation to support the channel:
[ Ссылка ]
Equipment Used:
SD Card: [ Ссылка ]
Tripod: [ Ссылка ]
Camera: [ Ссылка ]
Camera Mount: [ Ссылка ]
Computer: [ Ссылка ]
External HD: [ Ссылка ]
Glass Cleaner: [ Ссылка ]
Tablet: [ Ссылка ]
Tablet Accessories: [ Ссылка ]
Smartphone Gimbal: [ Ссылка ]
DISCLAIMER: This video and description contains affiliate links, which means that if you click on one of the product links I’ll receive a small commission. This helps support the channel and allows me to bring you more videos in more places. Thank you for the support!
From Wikipedia:
Interstate 4 (I-4) is an Interstate Highway located entirely within the U.S. state of Florida, maintained by the Florida Department of Transportation (FDOT). Spanning 132.298 miles (212.913 km) along a generally southwest–northeast axis, I-4 is entirely concurrent with State Road 400 (SR 400). In the west, I-4 begins at an interchange with I-275 in Tampa. I-4 intersects with several major expressways as it traverses Central Florida, including U.S. Route 41 (US 41) in Tampa; US 301 near Riverview; I-75 near Brandon; US 98 in Lakeland; US 192 in Celebration; Florida's Turnpike in Orlando; and US 17 and US 92 in multiple junctions. In the east, I-4 ends at an interchange with I-95 in Daytona Beach, while SR 400 continues for roughly another 4 mi (6.4 km) and ends at an intersection with US 1 on the city line of Daytona Beach and South Daytona.
Construction on I-4 began in 1958; the first segment opened in 1959, and the entire highway was completed in 1965. The "I-4 Ultimate" project, currently in progress, will oversee the construction of variable-toll express lanes and numerous redevelopments through the 21-mile (34 km) stretch of highway extending from Kirkman Road (SR 435, exit 75) in Orlando to SR 434 (exit 94) in Longwood. The project broke ground in 2015, and the express lanes opened to traffic on February 26, 2022. Previously, the median of I-4 between Tampa and Orlando was the planned route of a now-cancelled high-speed rail line. From a political standpoint, the "I-4 corridor" is a strategic region given the large number of undecided voters in a large swing state.
Time Stamps:
Orange County: 0:00-15:05
Seminole County: 15:06-27:13
Volusia County: 27:14
![](https://i.ytimg.com/vi/OQ12H6wPP2c/maxresdefault.jpg)