The Lahore Orange Line Metro Train Project showcases the paragonic features which altogether make the first mass transit train as a monumental facility of travelling along a route of 27 km out of which 25 km is elevated while 1.7 runs underground. Facilitated with a depot and a stabling yard at each end, 24 elevated stations with the area of each station is 70,000 Sft. Two stations have also been constructed underground. The first one is at GPO with a spacious area under one roof of 100,000 sft and the second one at Anarkali partly underground and partly at ground on a large area of 150,000 Sft. The other salient structures include a number of 40 crossovers, an arched shape bridge over the ring road, beside Railway bridge and roads at grade.
Ещё видео!