Transfer Posting from Plant to Plant in sap mm
Transfer the stock from one plant to another
Let's see the process
I have two plants
1. Plant : PH07
2. Plant : PH08
I have created many materials on plant PH07 , Lets take anyone of the material from this plant PH07
Before that check the stock of that material T Code : MMBE
Material : 854000160
Stock 5000 Kg
Extended this material 854000160 with 2nd plant PH08
TCode MM01
I have extended the same material to both plant PH07 & PH08
Plant PH07 Having 5000 Kg , Now i want to transfer the 3000 Kg to the plant PH08
Plant Ph08 has no stock currently..
Transfer posting T Code : MIGO Movement Type : 301
Material document 4900004391
Accounting Entries
Stock A/c BSX Debited for sending Plant(PH07)
Stock A/c BSX Credited for receiving Plant (PH08)
Now the stock in both plants PH07 & PH08
1.Plant PH07 has transfer 3000 Kg to the Plant PH08 and debited 300o Kg
2. Plant Ph08 has received 3000 kg from the plant PH07 and credited 3000 kg
![](https://s2.save4k.ru/pic/W9oR7ERfmFo/maxresdefault.jpg)