This is 4K drone footage of the William H. Zimmer Power Station in Moscow, Ohio. This video was taken on 3/23/2019 using a DJI Phantom 4 Pro drone.
Check out the Drones Galaxy website for tutorials and reviews about drones: [ Ссылка ]
Website for more information about the William H Zimmer Power Plant: [ Ссылка ]
The William H. Zimmer Power Station, located near Moscow, Ohio, was a 1.35-gigawatt (1,351 MW) coal power plant. Planned by Cincinnati Gas and Electric (CG&E) (a forerunner of Duke Energy), with Columbus & Southern Ohio Electric (a forerunner of American Electric Power (AEP)) and Dayton Power & Light (DP&L) as its partners, it was originally intended to be a nuclear power plant. Although once estimated to be 97% complete, poor construction and quality assurance (QA) led to the plant being converted to coal-fired generation.The plant began operations in 1991. Today, the plant is owned and operated by Vistra Corp.
The construction of Zimmer was a consortium of CG&E, Columbus & Southern Ohio Electric, and DP&L. The project was announced in 1969 with a cost of $420 million to construct two 840 MW nuclear power units with completion dates set for 1975 and 1976. The plant is named after William H. Zimmer, who was chairman and president of CG&E from 1962 to 1975. Construction of the plant did not start until 1972 because the Atomic Energy Commission (AEC) demanded stricter standards to approve of nuclear plants. The second proposed unit was upgraded from 840 MW to 1,170 MW in 1974. General Electric's BWRs were chosen for the plant's nuclear reactors. Ultimately, the second unit was never constructed due to regulatory issues and costs.
CG&E, AEP and DP&L announced the cancellation of the Zimmer Nuclear Power Plant in 1983. Zimmer's total sunk costs amounted to roughly $1.6 billion; CG&E's share was $716 million, nearly 90% of the utility's 1982 net worth. Retired Navy Admiral Joe Williams Jr. was hired to bring the plant on-line, and Bechtel was retained to nuclear-qualify the plant. Bechtel came in with an estimate of more than $1.5 billion—beyond the $1.6 billion already spent—to adequately complete the plant.
Originally expected to cost $240 million for one unit, when the cost estimate soared to at least $3.1 billion, the decision was made in January 1984 to convert the mothballed plant into a coal-fired generated plant. Sargent & Lundy, who was the architect/engineering firm, and General Electric were sued by the three utilities in July 1984. The utilities sought $400 million in damages asserting the defective equipment caused extra costs for the construction of Zimmer. The lawsuit was settled in November 1987 with Sargent & Lundy agreeing to pay $27.4 million to the utilities. The utilities agreed to pay $12.7 million to Sargent & Lundy.
In September 2020, Vistra announced it would be retiring the Zimmer plant by year-end 2027. On July 19, 2021, Vistra announced the plant will shut down five years earlier, on May 31, 2022, because they failed to secure any capacity revenues in the May 2021 wholesale electricity market auction held by the grid operator, PJM Interconnection.
Music Info: Epic Cinematic Dramatic Adventure Trailer by RomanSenykMusic.
Music Link: [ Ссылка ]
Equipment Used (Amazon Affiliate Links):
DJI Phantom 4 Pro V2: [ Ссылка ]
Apple IPad Air 2: [ Ссылка ]
DJI Phantom 4 Spare Battery: [ Ссылка ]
Kinbon Drone Landing Pad: [ Ссылка ]
256GB SD Card: [ Ссылка ]
Battery Charging Hub: [ Ссылка ]
Sun Hood Cover: [ Ссылка ]
Video Editing Workstation
Processor - AMD Ryzen 9 5950X: [ Ссылка ]
System Board - ASUS ROG Crosshair VIII Dark Hero: [ Ссылка ]
Case - Corsair Graphite 760T: [ Ссылка ]
Graphics Card - ASUS ROG Strix NVIDIA GeForce RTX 3070 Ti OC Edition: [ Ссылка ]
Liquid Cooler - NZXT Kraken Z73: [ Ссылка ]
Memory - TEAMGROUP T-Force Vulcan Z DDR4 64GB Kit: [ Ссылка ]
System Hard Drive - INLAND Performance Plus 2TB NVMe: [ Ссылка ]
Data Hard Drive - Seagate Barracuda SATA: [ Ссылка ]
Power Supply - Dark Power 12: [ Ссылка ]
Ещё видео!