Video taken on the10th Feb 2011
Cairn Curran Reservoir was constructed between 1947 and 1956. The storage has a primary spillway, and a secondary spillway situated 2 km south‑west of the main structure that will spill before the embankment is overtopped.
A 2 MW Hydro-electric power station generates electricity when irrigation and flood releases are being made.
[ Ссылка ]
![](https://i.ytimg.com/vi/X73XMMmXoo8/maxresdefault.jpg)