Blue Iron Foundations & Shoring, LLC. installed 3,431 lineal feet of sheet pile between 38 foot to 45 foot lengths to widen the Fullerton Creek Channel. This project was performed under Kiewit Construction for the County of Orange Flood Control Unit. Due to our vast fleet of equipment we were able to provide the project with two Giken Eco 1400 Silent Pilers to simultaneously install both channel walls. BIFS designed & built trestles for the top of the sheet pile to run the Giken Power Packs along the top of the wall due to the tight site constraints. Sheet Pile were shuttled into the channel and pitched to the equipment utilizing a RT 1100 Linkbelt Crane. Due to our experienced operators and project team we completed the work ahead of schedule without any injuries. Blue Iron Foundations & Shoring prides itself on being the US Leader of sheet pile installation using percussive free & vibration free pile driving techniques to install piles in areas with difficult ground conditions and sensitive structures. For more information on the GIken Silent Piler please visit our site at [ Ссылка ]
Video Credit: [ Ссылка ]
Ещё видео!