Place the instrument on a stable table, avoiding air drafts and then put the instrument together in following order:
• First, open the lid and put the draft shield in place.
• Then, add the sample pan holder.
• Then, add the sample pan handler and then close the lid
• Then connect the power cable.
Finally, level the instrument using the front feet so that the bubble is centered.
You can now switch on the instrument.
Learn more about the HE53 and HE73 moisture analyzers
[ Ссылка ]
Ещё видео!