Experience the captivating time-lapse journey of the multi-use burn tower's construction progress, specifically showcasing the pouring of the 162 cubic yards of concrete for the 14-1/2" thick second-floor structural slab. This remarkable structure is divided into three sections: a three-story portion on the left, a two-story wing with a small basement in the center, and a four-story section on the right. This is the only level where all three sections share a floor space. The upcoming pour will integrate the two-story roof with the third-floor structural slabs of the three-story and four-story sections. In addition, a separate video of the stand-alone six-story second-floor slab has been shared. Feel free to reach out for any further information or inquiries.
Ещё видео!