Track #3 signal at the Milepost 11.9 automatic signal location changes from Approach to Clear resulting in the cab signal 75ppm code generator cutting out and the 180ppm generator cutting in. Note the brief gap in code as the relays settle and the corresponding change in the position light signal from Approach / to Stop and Proceed --- before moving to Clear |.
Ещё видео!