Work to build London’s super sewer, including its tunnels and shafts, is now fully complete following the lifting of the final piece of the puzzle into place in east London. And now, the project is closer than ever to its ultimate goal of improving the health of the Thames – after a 1,200-tonne concrete lid was lifted on top of a deep shaft at Abbey Mills.
![](https://s2.save4k.ru/pic/bX9HUO4BpLE/mqdefault.jpg)