The Pink Line of Namma Metro 21.25 km line connects Kalena Agrahara station on Bannerghatta road in the south with Nagawara station on Outer Ring road in the north.
The Pink Line Underground 13.92 km. 6.98 km elevated section and a 0.48 km at-grade (surface) section.
There are 18 stations on the line of which 12 are underground and 6 are elevated.
Station Name :
1 Kalena Agrahara
2 Hulimavu
3 IIMB
4 JP Nagar 4th Phase
5 Jayadeva Hospital
6 Tavarekere
7 Dairy Circle
8 Lakkasandra
9 Langford Town
10 National Military School
11 Mahatma Gandhi Road
12 Shivaji Nagar
13 Cantonment
14 Pottery Town
15 Tannery Road
16 Venkateshpura
17 Kadugundanahalli
18 Nagawara
Pink Line will have an interchange with the Purple Line at MG Road station. It will also have interchanges with the Yellow line at Jayadeva Hospital station and with the Blue Line at Nagawara. Both these lines are under construction
TBM-Lavi, a slurry based machine, launched on 10.02.2021 at Shivajinagar
Metro station completed its tunnelling of 1076 meters and achieved a
breakthrough at M.G Road Station on 15.04.2022. This TBM will further drive through the station area between M.G. Road to Rashtriya Military School.
TBM -Tunga a slurry based machine Tunneling from Venkateshpura Station to Shadhi Mahal Shaft for Length 1064m achieved a
breakthrough at Shadhi Mahal Shaft on 24.08.2022.
Ещё видео!