6 weeks of work in 4 minutes.
- Adding drywall to the existing structure w/ green glue & cutting for windows & electrical
- Mudding the drywall screws & gaps
- Adding Joists
- Steel framing, getting it plumb & level
- Drywall + Insulation for new walls
- Mounting a solid core door on steel studs
- Painting
- Sound Tests
- Acoustical Treatment Building
- Acoustical treatment installations
This captioning does not even show the detail that went into this work, it was a LOT of freaking work and planning and we had to build these walls based on the existing structure of the building. Lots and lots of planning before execution. The narration does not do this video justice. However I hope you enjoy.