Demolition of a big viaduct in Amstelveen over the Keizer Karelweg by Adex Groep ([ Ссылка ]). It is making place for the new motorway A9 and need to be demolished. In 48 hours time need the complete viaduct to be demolished and also the debris have to be removed. Adex Groep used for the job a fleet of 10 Caterpillar excavator is used. The new 320 tons demolition excavator 'The Genius' and Cat 390F STC UHD demolition excavator where the biggest demolition machines on the jobsite.
'The Genius' demolition excavator is working with 16 tons Dehaco /MBI MS 140R Multi-Shear with an opening of 2.3 meter. The Cat 390F STC UHD demolition excavator with triple boom is working with 12.3 tons Dehaco/MBI CR 100R concrete shear with opening of 2 meter. By using this big demolition machines of the Adex Groep, the complete 6.000 tons bridge demolition is finished in a record time of 36 hours!
Ещё видео!