Watch the full changeover video here: [ Ссылка ]
Changing over tooling is an essential part of owning your machine. Tim walks you through the SSR™ MultiPro Jr. changeover process step by step. Check out the full video.
Interested in learning more about a machine? Contact us here: [ Ссылка ]
**********************************
FOLLOW THE NEW TECH MACHINERY TEAM
►[ Ссылка ]
►[ Ссылка ]
Visit Our Website: [ Ссылка ]
Subscribe To Our Blog: [ Ссылка ]
Machine should never be operated without the guards in place. Otherwise severe injury can occur. Machine must be operated by a competent trained individual and never be operated by a person who has not had proper training, studied the video and the latest operating manual found at www.newtechmachinery.com/resources/machine-manuals. Failure to operate correctly or without guards can result in severe injury.
New Tech Machinery provides no warranty (finish, substrate or weather tight) in relation to the metal roofing systems the machines form. Should a warranty be required, users should consult with metal roof manufacturer or coil supplier prior to contracting on work. It is the sole responsibility of the installer and/or metal panel manufacturer to ensure that the roof system meets all engineering and local building codes.
Ещё видео!