We captured this great feat of engineering by HS2 Ltd using our high specification timelapse systems, and stunning 4k video cameras.
They slid the 12,600 tonne bridge a record 163 metres to position it across a motorway in Warwickshire.
The dramatic operation took 40 hours, at a speed of 4 metres per hour, from Saturday 24 to Monday 26 December.
#HS2 #Infrastructure #RailIndustry #Engineering #Construction #Britain
For more information about our filming services or to get in touch visit:
Website: [ Ссылка ]
Linkedin: [ Ссылка ]
![](https://i.ytimg.com/vi/hrIpVbGZvlA/maxresdefault.jpg)