GSE Tank 8's Aft Dome is flipped in preparation of stacking as the rest of the tank section resides in the Mid Bay. Tank 8 will complete the first Tank Farm at the Orbital Launch Site. Meanwhile, work on the Carriage System for the Chopsticks continues.
Video & Photos from Mary (@BocaChicaGal) and Nic (@NicAnsuini). Edited by Nathan Shields.
All content copyright to NSF. Not to be used elsewhere without explicit permission from NSF.
Click "Join" for access to early fast turnaround clips, exclusive discord access with the NSF team, etc - to support the channel.
Rolling Updates and Discussion: [ Ссылка ]
Articles: [ Ссылка ]
NSF Store: [ Ссылка ]
L2 Boca Chica (more clips and photos) from BC's very early days to today.
[ Ссылка ]
(Join L2 and support NSF here: [ Ссылка ])
0:00 - Sunrise Over the Launch Site
0:37 - Quick Disconnect Arm on the Orbital Launch Tower
0:47 - The Top of the Orbital Launch Tower
1:07 - Ship 20's Hatch is Open for Worker Access
1:26 - Thermal Protection Tiles on Ship 20 Look Nearly Repaired
2:05 - Crews Working on the LR 11350 Crane
3:25 - Carriage System for the Chopsticks
4:04 - SN15 and Ship 16 Peek Over the Propellant Production Plant
4:24 - Coil of Stainless Steel Delivered to the Production Site
4:44 - Work Continues on Possible Quick Disconnect Arm Extension
5:43 - Work on the Ground Fabrication Building Expansion Continues
6:02 - Barrel Sections at the Production Site
6:22 - GSE Tank 8 Aft Dome Section Flipped
7:20 - Booster 5 Under Construction in the High Bay
7:40 - GSE Tank 8 in the Mid Bay
8:00 - The Propellant Production Site
8:34 - Booster Thrust Simulator Stand
8:53 - Test Tanks and Booster Thrust Simulator
9:13 - Booster Thrust Simulator (left) and GSE 4 Test Tank (right)
9:33 - Foundation Work for the Wider High Bay
9:52 - Barrel Section with TPS Tile Attachment Points in the Scrapyard
10:12 - Booster 5 Forward Tank Section #2 at the Production Site
11:07 - GSE Tank 8 Aft Section Moved Towards the Mid Bay
11:47 - A Ship Common Dome and a Methane Header Tank at the Production Site
13:05 - Booster 5's Forward Dome Sleeve Moved
13:26 - Booster 5 and Ship 21 Forward Dome Sleeves
14:04 - A Ship Common Dome on the Sleeving Stand
14:45 - GSE Tank 8 Aft Section Hooked to Crane Outside Mid Bay
15:05 - GSE Tank 8 Aft Section Lifted into the Mid Bay
![](https://i.ytimg.com/vi/pcr405Dzq9g/maxresdefault.jpg)