In this video shown gravel road maintenance with MeriROAD equipment.
Work phases are following
1. Crushing the road with the RC90-221 DTG road crusher to a depth of 10-15 cm. In this way, a maintenance layer free of large stones is obtained on the surface
2. Compacting the crushed layer with MeriPacker MPC-375 vibrating plate
3. Profiling and levelling of the road with MeriGrader MGR-420
4. Final compacting and levelling with MeriPacker
For more information!
[ Ссылка ]
![](https://i.ytimg.com/vi/tPKi9vyW3fI/maxresdefault.jpg)