Janssen & Spaans Engineering, Inc. developed an innovative, fast-track method to disconnect and then float out the existing bridges. Members with existing deterioration were analyzed, rehabilitated and strengthened prior to the float out. The structures were lifted using water filled barges that could be emptied to provide hydrostatic lift.
Ещё видео!