Title- Meerut Metro trail run | Meerut Metro project update | Delhi-Meerut RRTS update | Papa Construction
Suggested Video-
Ananad Vihar RRTS [ Ссылка ]
Delhi Meerut RRTS -[ Ссылка ]
Jewar Airport RRTS [ Ссылка ]
Delhi Meerut Expressway- [ Ссылка ]
---------------------------------------------------
To subscribe the channel- [ Ссылка ]
Facebook Page- [ Ссылка ]
Instagram- [ Ссылка ]
Twitter- [ Ссылка ]
Email- papa.constrn@gmail.com
----------------------------------------------------------
The Meerut Metro is an under-construction rapid transit system, which will serve the city of Meerut, Uttar Pradesh, India. It is being built in two phases, of which the first phase with the first line will cover 23.6 km (14.7 mi) with 13 stations, from Modipuram to Meerut South. It will have nine elevated, three underground stations, one at-grade station as the depot station at Modipuram, and four stations integrated with the Delhi–Meerut Regional Rapid Transit System on a single corridor, making the metro the first such rapid transit system in India to be merged directly with a regional transit system. The second phase will include a second line covering 15 km (9.3 mi) from Shradhapuri Phase-II to Jagrati Vihar, with 12 stations, out of which seven will be elevated and five will be underground, thereby taking the overall length to 38.6 km (24.0 mi). The metro will also be the fastest metro of India, at an operational speed of 120 km/h (75 mph). In an innovative approach, the Meerut Metro will operate on the same RRTS infrastructure from Meerut South to Modipuram. This integration is vital for providing a holistic and seamless new-age public transit mode for the people of western Uttar Pradesh. At four of these stations, commuters will be able to switch to Namo Bharat train services and vice versa. These stations will be Meerut South, Shatabdi Nagar, Begumpul, and Modipuram. This innovative approach has led to significant savings in terms of construction cost of infrastructure viz OHE, viaduct, track, signalling etc. The Meerut Metro corridor spans 23 km with 13 stations, including 18 km of elevated and 5 km of underground sections. Nine stations are elevated, three are underground, and one station (depot station) will be at grade. This 23 km distance will be covered by these modern trainsets within 30 minutes. The stations are Meerut South (elevated), Partapur.
#meerutmetro
#rrtsmeerut
#delhimeerutrrts
Ещё видео!