The Luan Zhou non-navigable span bridge of the Changtai Yangtze River Bridge recently had its final 15x10m and 47t deck plate safely hoisted onto the upper deck frame of the steel truss girder, signaling a significant advancement in the bridge's main bridge's construction. The Normal Bridge's roadside is now making significant development as well. On the roadside, the ninth span has been moved, raised, and cemented together; on the railroad side, the sixth span has been moved, lifted, and glued together. equal strength over a wide range. lifting a crane for the higher high-speed bridge 🌁🌉