Ship 24 has an aft flap installed as SpaceX prepares for the outcome of the FAA's Environmental Assessment. Meanwhile, crews work on the Cryo Station as Raptor Vacuum Boxes leave the Production Site.
Video and Pictures from Mary (@BocaChicaGal), Nic (@nicansuini) and the NSF Robots. Edited by Brady (@TheFavoritist).
All content copyright to NSF. Not to be used elsewhere without explicit permission from NSF.
Click "Join" for access to early fast turnaround clips, exclusive discord access with the NSF team, etc - to support the channel.
Rolling Updates and Discussion: [ Ссылка ]
Articles: [ Ссылка ]
NSF Store: [ Ссылка ]
L2 Boca Chica (more clips and photos) from BC's very early days to today.
[ Ссылка ]
(Join L2 and support NSF here: [ Ссылка ])
0:00 Lunar Eclipse
0:56 The Launch Site
1:19 Crews Work on the Chopsticks
2:25 New SPMT Delivered
2:47 Crews Work on the Structural Test Stand
4:37 Cryo Station’s Starship Quick Disconnect
5:21 Starship Quick Disconnect Arm
6:08 The Orbital Launch Mount
6:30 Road Repairs at the Launch Site
7:14 New Gate Installed at the Launch Site
8:37 Announcement Over the PA system
8:58 Booster 7 in the Mega Bay
10:06 Raptor Vacuum Boxes at the Production Site
10:59 Flaps Removed from Ship 16’s Nosecone
11:23 Ship 24 and Booster 8 in the High Bay
11:15 Ship 24 Aft Flap Lifted Into Place
12:18 Booster 7
12:45 Ship 16’s Nosecone Scrapped
14:10 Ship 16’s Flaps Loaded Onto a Flatbed
15:42 Raptor Vacuum Boxes Leave the Production Site
16:16 Fuel Storage Tanks Delivered
16:33 Structure Lifted for the Mega Bay
![](https://i.ytimg.com/vi/JBteRhaDLqk/maxresdefault.jpg)