You can start your project small, is a continuous process. Be positive, you surely will finish what you started! 4 head-pans = 1 wheel barrow; so far on this flooring project my mix ratio 1:2:3 - I'll have it as 1 bag of cement : 2 wheel barrow of sand : 3 wheel barrow of stone etc. however people do this work with different ratios. Over time on site however; you always find the above mix to have too much sand or too much stone....but that doesn't mean the ratios are wrong; IT MEANS OUR MEASUREMENTS ARE NOT ACCURATE - We can only get an accurate mix if we're using a batching plant (off-course not on our little project is this possible). Lastly; the other factor that affect this ratio is the size of stone; the smaller the granite size, the more you might need to add eg if I'm using the smallest chippings (1/4) of an Inch; I might need to make my ratio 1:2:4 instead of 1:2:3 to ensure adequate strength. Materials: 46 bag of cement/ 1 trip of Granite / 2 trips of sand. Keep subscribing!!